Minimizing the sum of maximum earliness and maximum tardiness in single -machine scheduling problem with sequenced-dependent setup time
NEKOIE MEHR N., MOSLEHI G., "Minimizing the sum of maximum earliness and maximum tardiness in single -machine scheduling problem with sequenced-dependent setup time", JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Vol. 62, No. 7, PP. 1403_14121, 2011.
Journal Papers
Month/Season:
Summer
Year:
2011