For Better Performance Please Use Chrome or Firefox Web Browser

Publications

RAJAEI M., MOSLEHI G., REISINAFCHI M., "The split heterogeneous vehicle routing problem with three-dimensional loading constraints on a large scale", EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 229, No. 2, PP. 706_721, 2022.

 

RAJABI P., MOSLEHI G., REISINAFCHI M., "New integer programming models for slab stack shuffling problems", APPLIED MATHEMATICAL MODELLING, Vol. 109, PP. 775_796, 2022.

 

KHORASANIAN D., DEXTER F., DEMEULEMEESTER E., MOSLEHI G., "Minimizing the number of cancellations at the time of a severe lack of post anesthesia care unit beds or nurses", INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 11, No. 60, PP. 3383_3395, 2022

 

BOOSAEIDI OSHTORJANI S., REISINAFCHI M., MOSLEHI G., "OPERATING ROOM SCHEDULING CONSIDERING PATIENT PRIORITIES AND OPERATING ROOM PREFERENCES: A CASE STUDY", International Journal of Industrial Engineering and Production Research, Vol. 33, No. 2, PP. 1_21, 2022.

 

AKBARZADEH B., MOSLEHI G., REISINAFCHI M., MAENHOUT B., "A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering", JOURNAL OF SCHEDULING, Vol. 23 , 2020.

RAJAEI M., MOSLEHI G., REISINAFCHI M., "The split heterogeneous vehicle routing problem with three-dimensional loading constraints on a large scale", EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 229, No. 2, PP. 706_721, 2022.

 

EGHBALPOR P., REISINAFCHI M., MOSLEHI G., "Single Machine Scheduling Problem of Minimizing Weighted Sum of Maximum Weighted Earliness and Weighted Number of Tardy Jobs", International Journal of Manufacturing Research , ۲۰۲۰.

 

NASROLLAHI V., MOSLEHI G., REISINAFCHI M., "Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem", Operational Research , ۲۰۲۰.

 

SABERIALIABAD H., REISINAFCHI M., MOSLEHI G., "Energy-Efficient Scheduling in an Unrelated Parallel-Machine Environment Under Time-Of-Use Electricity Tariffs", JOURNAL OF CLEANER PRODUCTION, Vol. 249, PP. 1_11, 2020.

 

AKBARZADEH B., MOSLEHI G., REISINAFCHI M., MAENHOUT B., "The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling", EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 278, No. 2, PP. 596_614, 2019.

 

FAZELI M., MOSLEHI G., MOLLAVERDIISFAHANI N., REISINAFCHI M., "Customer's order acceptance and scheduling to maximise total profit", International Journal of Operational Research, Vol. 34, No. 2, PP. 301_320, 2019.

 

KHOSRAVIAN GHADIKOLAEI Y., SHAHANDEH NOOKABADI A., MOSLEHI G., "Mathematical Model for Bi-objective Maximal Hub Covering Problem with Periodic Variations of Parameters", International Journal of Engineering- Transation a, Vol. 32, No. 7, PP. 964_975, 2019.

 

AHMADI DARANI M., MOSLEHI G., REISINAFCHI M., "A two-agent scheduling problem in a two-machine flowshop", international journal of industrial engineering computations, Vol. 9, No. 3, PP. 289_306, 2018.

 

KHORASANIAN D., DEXTER F., MOSLEHI G., "Analyses of the phase I postanesthesia care unit baseline capacity and effect of disruptions to its beds or nurse availability on operating room workflow", International Journal of planning and scheduling, Vol. 2, No. 4, PP. 350_372, 2018.

 

KIANFAR K., MOSLEHI G., SHAHANDEH NOOKABADI A., "Exact and heuristic algorithms for minimizing Tardy/Lost penalties on a single machine scheduling problem", COMPUTATIONAL and APPLIED MATHEMATICS, Vol. 37, No. 2, PP. 865_897, 2018.

 

MASHKANI O., MOSLEHI G., "Minimizing the Number of Tardy Jobs in Single Machine Scheduling Problem under Bimodal Flexible Periodic Availability Constraints", International Journal of Industrial Engineering and Productional Research-, Vol. 29, No. 1, PP. 15_34, 2018.

 

VAEZ P., BIJARI M., MOSLEHI G., "Simultaneous scheduling and lot-sizing with earliness/tardiness penalties", International Journal of planning and scheduling, Vol. 2, No. 4, PP. 273_291, 2018.

 

EMAMI S., MOSLEHI G., SABBAGH M., "A Benders decomposition approach for order acceptance and scheduling problem a robust optimization approach", COMPUTATIONAL and APPLIED MATHEMATICS, Vol. 30, No. 4, PP. 1471_1515, 2017.

 

GANJI F., MOSLEHI G., GHALEBSAZ JEDDI B., "Minimizing maximum earliness in single-machine scheduling with flexible maintenance time", Scientia Iranica, Vol. 4, No. 24, PP. 2082_2094, 2017.

 

GERAMIPOUR S., MOSLEHI G., REISINAFCHI M., "Maximizing the profit in customer s order acceptance and scheduling problem with weighted tardiness penalty", JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Vol. 68, No. 1, PP. 89_101, 2017.

 

KHORASANIAN D., MOSLEHI G., "Two-machine flow shop scheduling problem with blocking multi-task flexibility of the first machine and preemption", COMPUTERS and OPERATIONS RESEARCH, Vol. 79, PP. 94_108, 2017.

 

KIANFAR K., MOSLEHI G., "Minimizing a General Penalty Function on a Single Machine via Developing Approximation Algorithms and FPTASs", International Journal of Industrial Engineering and Production Research, Vol. 28, No. 3, PP. 221_240, 2017.

 

ALIMORADI S., HEMMATIAN M., MOSLEHI G., "Robust scheduling of parallel machines considering total flow time", COMPUTERS and INDUSTRIAL ENGINEERING, Vol. 93, PP. 152_161, 2016.
 

EMAMI S., SABBAGH M., MOSLEHI G., "A Lagrangian relaxation algorithm for order acceptance and scheduling problem a globalized robust optimization approach", INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, Vol. 5, No. 29, PP. 535_560, 2016.

 

KIANFAR K., MOSLEHI G., SHAHANDEH NOOKABADI A., "An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine", Journal of Industrial and Systems Engineering, Vol. 2, No. 9, PP. 1_19, 2016.

 

MASHKANI O., MOSLEHI G., "Minimizing the Total Completion Time in a Single Machine Scheduling Problem under Bimodal Flexible Periodic Availability", INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, Vol. 29, No. 3, PP. 323_341, 2016.

 

KIANFAR K., MOSLEHI G., YAHYAPOUR R., "A novel metaheuristic algorithm and utility function for QoS based scheduling in user-centric grid systems", JOURNAL OF SUPERCOMPUTING, Vol. 71, No. 3, PP. 1143_1162, 2015.

 

REISINAFCHI M., MOSLEHI G., "A hybrid genetic and linear programming algorithm for two-agentorder acceptance and scheduling problem", APPLIED SOFT COMPUTING, Vol. 33, PP. 33_47, 2015.

 

REISINAFCHI M., MOSLEHI G., "Integrating Two-agent Scheduling and Order Acceptance to Maximize Total Revenue and Bounding Each Agent Penalty Function", International Journal of Services and Operations Management, Vol. 3, No. 20, PP. 358_384, 2015.

 

REISINAFCHI M., MOSLEHI G., "Two-agent order acceptance and scheduling to maximize total revenue", European Journal of Industrial Engineering, Vol. 9, No. 5, PP. 664_691, 2015.

 

KHORASANIAN D., MOSLEHI G., "A hybrid variable neighborhood search algorithm for limited-buffer permutation flow shop scheduling problem with makespan criterion", COMPUTERS and OPERATIONS RESEARCH, Vol. 52, PP. 260_268, 2014.

 

MOLAEE E., MOSLEHI G., "Minimizing the Number of Tardy Jobs on a Single Machine with an Availability Constraint", journal of industrial engineering, Vol. 2014, PP. 1_13, 2014.

 

MOSLEHI G., KIANFAR K., "Approximation Algorithms and an FPTAS for the Single Machine Problem with Biased Tardiness Penalty", JOURNAL OF APPLIED MATHEMATICS, Vol. 2014, PP. 1_10, 2014.

 

BAHRAMI F., MOSLEHI G., "Study of Payment Scheduling Problem to Achieve Client - Contractor Agreement", INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol. 64, No. 4, PP. 497_511, 2013.

 

EBADI A., MOSLEHI G., "An optimal method for the preemptive job shop scheduling problem", COMPUTERS and OPERATIONS RESEARCH, Vol. 40, No. 5, PP. 1314_1327, 2013.

 

KHORASANIAN D., HEJAZI TAGHANAKI S., MOSLEHI G., "Two-sided assembly line balancing considering the relationships between tasks", COMPUTERS and INDUSTRIAL ENGINEERING, Vol. 66, No. 4, PP. 1096_1105, 2013.

 

KHORASANIAN D., MOSLEHI G., "Optimizing blocking flow shop scheduling problem with total completion time criterion", COMPUTERS and OPERATIONS RESEARCH, Vol. 40, No. 7, PP. 1874_1883, 2013.

 

KIANFAR K., MOSLEHI G., "A note on Fully polynomial time approximation scheme for the total weighted tardiness minimization with a common due date", DISCRETE APPLIED MATHEMATICS, Vol. 161, No. 13-14, PP. 2205_2206, 2013.

 

MAHNAM M., MOSLEHI G., FATEMI GHOM S., "Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness", MATHEMATICAL AND COMPUTER MODELLING, Vol. 57, No. 9-10, PP. 2459_2463, 2013.

 

REISINAFCHI M., MOSLEHI G., "Cockpit Crew Pairing Problem in Airline Scheduling Shortest Path with Resources Constraints Approach", International Journal of Industrial Engineering and Production Research, Vol. 24, No. 4, PP. 259_268, 2013.

 

EBADI A., MOSLEHI G., "Mathematical models for preemptive shop scheduling problems", COMPUTERS and OPERATIONS RESEARCH, Vol. 39, No. 7, PP. 1605_1614, 2012.
 

JAFARI NEDOSHAN A., MOSLEHI G., "Scheduling linear deteriorating jobs to minimize the number of tardy jobs", JOURNAL OF GLOBAL OPTIMIZATION, Vol. 54, No. 2, PP. 389_404, 2012.

 

KHORASANIAN D., MOSLEHI G., "An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria", International Journal of Industrial Engineering and Production Research, Vol. 23, No. 4, PP. 301_308, 2012.

 

KIANFAR K., MOSLEHI G., "A branch-and-bound algorithm for the single machine scheduling with quadratic earliness and tardiness penalties", COMPUTERS and OPERATIONS RESEARCH, Vol. 39, No. 12, PP. 2978_2990, 2012.

 

MOSLEHI G., ROHANI M., "Finding Pareto-optima for maximum tardiness maximum earliness and number of tardy jobs", International Journal of Operational Research, Vol. 14, No. 4, PP. 433_452, 2012.

 

MOLAEE E., MOSLEHI G., REISI NAFCHI M., "Minimizing Maximum Earliness and Number of Tardy Jobs in the Single Machine Scheduling Problem with Availability Constraint", COMPUTERS and MATHEMATICS WITH APPLICATIONS, Vol. 62, PP. 3622_3641, 2011.

 

MOSLEHI G., MAHNAM M., "A Pareto Approach to Multi-objective Flexible Job-Shop Scheduling Problem Using Particle Swarm Optimization and Local Search", INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 129, No. 1, PP. 14_22, 2011.

 

NEKOIE MEHR N., MOSLEHI G., "Minimizing the sum of maximum earliness and maximum tardiness in single -machine scheduling problem with sequenced-dependent setup time", JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Vol. 62, No. 7, PP. 1403_14121, 2011.

 

REISI NAFCHI M., MOSLEHI G., "Minimizing the Number of Tardy Jobs and Maximum Earliness in the Single Machine Scheduling Using an Artificial Immune System", INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol. 54, No. 5, PP. 749_756, 2011.

 

KHAKBAZ H., MOSLEHI G., YAZDIAN POUR M., "Technology Incubators in Iran Policies Experiences and Outcomes", Asia Pacific Journal of INNOVATION AND ENTREPRENEURSHIP, Vol. 4, No. 2, PP. 5_7, 2010.

 

MOLAEE E., MOSLEHI G., REISI NAFCHI M., "Minimizing Maximum Earliness and Number of Tardy Jobs in the Single Machine Scheduling Problem", COMPUTERS and MATHEMATICS WITH APPLICATIONS, Vol. 60, No. 11, PP. 2909_2919, 2010.

 

MOSLEHI G., JAFARI NEDOSHAN A., "Minimizing The Number Of Tardy Jobs Under Piecewise-linear Deterioration", COMPUTERS and INDUSTRIAL ENGINEERING, Vol. 59, No. 4, PP. 573_584, 2010.

 

MOSLEHI G., MAHNAM M., AMIN-NAYERI M., AZARON A., "A branch and bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine", International Journal Operational Research, Vol. 8, No. 4, PP. 458_482, 2010.

 

MAHNAM M., MOSLEHI G., "A branch and bound algorithm for minimizing the sum of maximum earliness and tardiness with unequal release times", ENGINEERING OPTIMIZATION, Vol. 41, No. 6, PP. 521_536, 2009.

 

MOSLEHI G., MIRZAI M., VASEI M., MODARRES M., AZARON A., "Two machine flow shop scheduling to minimize the sum of maximum earliness and tardiness", INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 122, No. 2, PP. 763_773, 2009.

 

TAVAKKOLI-MOGHADDAM R., MOSLEHI G., VASEI M., AZARON A., "A branch and bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert", APPLIED MATHEMATICS AND COMPUTATION, No. 174, PP. 388_408, 2006.

 

TAVAKKOLI-MOGHADDAM R., MOSLEHI G., VASEI M., AZARON A., "Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert", APPLIED MATHEMATICS AND COMPUTATION, No. 167, PP. 1430_1450, 2005.
 

 

تحت نظارت وف ایرانی