For Better Performance Please Use Chrome or Firefox Web Browser

An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria

KHORASANIAN D., MOSLEHI G., "An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria", International Journal of Industrial Engineering and Production Research, Vol. 23, No. 4, PP. 301_308, 2012.

 

Journal Papers
Month/Season: 
March
Year: 
2012

تحت نظارت وف ایرانی