For Better Performance Please Use Chrome or Firefox Web Browser

Two machine flow shop scheduling to minimize the sum of maximum earliness and tardiness

MOSLEHI G., MIRZAI M., VASEI M., MODARRES M., AZARON A., "Two machine flow shop scheduling to minimize the sum of maximum earliness and tardiness", INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 122, No. 2, PP. 763_773, 2009.

 

Journal Papers
Month/Season: 
Spring
Year: 
2009

تحت نظارت وف ایرانی