Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert |
Spring |
2005 |
A branch and bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert |
Spring |
2006 |
Two machine flow shop scheduling to minimize the sum of maximum earliness and tardiness |
Spring |
2009 |
A branch and bound algorithm for minimizing the sum of maximum earliness and tardiness with unequal release times |
Summer |
2009 |
Minimizing Maximum Earliness and Number of Tardy Jobs in the Single Machine Scheduling Problem |
Fall |
2010 |
Technology Incubators in Iran Policies Experiences and Outcomes |
Winter |
2010 |
A branch and bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine |
Spring |
2010 |
Minimizing The Number Of Tardy Jobs Under Piecewise-linear Deterioration |
Summer |
2010 |
Minimizing Maximum Earliness and Number of Tardy Jobs in the Single Machine Scheduling Problem with Availability Constraint |
Winter |
2011 |
Minimizing the Number of Tardy Jobs and Maximum Earliness in the Single Machine Scheduling Using an Artificial Immune System |
Spring |
2011 |
Minimizing the sum of maximum earliness and maximum tardiness in single -machine scheduling problem with sequenced-dependent setup time |
Summer |
2011 |
A Pareto Approach to Multi-objective Flexible Job-Shop Scheduling Problem Using Particle Swarm Optimization and Local Search |
Fall |
2011 |
Finding Pareto-optima for maximum tardiness maximum earliness and number of tardy jobs |
January |
2012 |
A branch-and-bound algorithm for the single machine scheduling with quadratic earliness and tardiness penalties |
February |
2012 |
An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria |
March |
2012 |
Scheduling linear deteriorating jobs to minimize the number of tardy jobs |
April |
2012 |
Mathematical models for preemptive shop scheduling problems |
May |
2012 |
An optimal method for the preemptive job shop scheduling problem |
June |
2013 |
Cockpit Crew Pairing Problem in Airline Scheduling Shortest Path with Resources Constraints Approach |
January |
2013 |
Study of Payment Scheduling Problem to Achieve Client - Contractor Agreement |
July |
2013 |
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness |
February |
2013 |
A note on Fully polynomial time approximation scheme for the total weighted tardiness minimization with a common due date |
March |
2013 |
Optimizing blocking flow shop scheduling problem with total completion time criterion |
April |
2013 |
Two-sided assembly line balancing considering the relationships between tasks |
May |
2013 |
Approximation Algorithms and an FPTAS for the Single Machine Problem with Biased Tardiness Penalty |
Spring |
2014 |
Minimizing the Number of Tardy Jobs on a Single Machine with an Availability Constraint |
Summer |
2014 |
A hybrid variable neighborhood search algorithm for limited-buffer permutation flow shop scheduling problem with makespan criterion |
Fall |
2014 |
Two-agent order acceptance and scheduling to maximize total revenue |
Spring |
2015 |
Integrating Two-agent Scheduling and Order Acceptance to Maximize Total Revenue and Bounding Each Agent Penalty Function |
Summer |
2015 |
A hybrid genetic and linear programming algorithm for two-agentorder acceptance and scheduling problem |
Fall |
2015 |
A novel metaheuristic algorithm and utility function for QoS based scheduling in user-centric grid systems |
Winter |
2015 |
A Lagrangian relaxation algorithm for order acceptance and scheduling problem a globalized robust optimization approach |
Fall |
2016 |
Robust scheduling of parallel machines considering total flow time |
Winter |
2016 |
Minimizing the Total Completion Time in a Single Machine Scheduling Problem under Bimodal Flexible Periodic Availability |
Spring |
2016 |
An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine |
Summer |
2016 |
Minimizing maximum earliness in single-machine scheduling with flexible maintenance time |
April |
2017 |
A Benders decomposition approach for order acceptance and scheduling problem a robust optimization approach |
May |
2017 |
Minimizing a General Penalty Function on a Single Machine via Developing Approximation Algorithms and FPTASs |
January |
2017 |
Two-machine flow shop scheduling problem with blocking multi-task flexibility of the first machine and preemption |
February |
2017 |
Maximizing the profit in customer s order acceptance and scheduling problem with weighted tardiness penalty |
March |
2017 |
Analyses of the phase I postanesthesia care unit baseline capacity and effect of disruptions to its beds or nurse availability on operating room workflow |
April |
2018 |
A two-agent scheduling problem in a two-machine flowshop |
May |
2018 |
Simultaneous scheduling and lot-sizing with earliness/tardiness penalties |
January |
2018 |
Minimizing the Number of Tardy Jobs in Single Machine Scheduling Problem under Bimodal Flexible Periodic Availability Constraints |
February |
2018 |
Exact and heuristic algorithms for minimizing Tardy/Lost penalties on a single machine scheduling problem |
March |
2018 |
Mathematical Model for Bi-objective Maximal Hub Covering Problem with Periodic Variations of Parameters |
Spring |
2019 |
Customer's order acceptance and scheduling to maximise total profit |
Summer |
2019 |
The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling |
Fall |
2019 |
Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem |
Summer |
2020 |
Single Machine Scheduling Problem of Minimizing Weighted Sum of Maximum Weighted Earliness and Weighted Number of Tardy Jobs |
Fall |
2020 |
A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering |
Winter |
2020 |
Energy-Efficient Scheduling in an Unrelated Parallel-Machine Environment Under Time-Of-Use Electricity Tariffs |
Spring |
2020 |
Minimizing the number of cancellations at the time of a severe lack of post anesthesia care unit beds or nurses |
March |
2022 |
New integer programming models for slab stack shuffling problems |
April |
2022 |
The split heterogeneous vehicle routing problem with three-dimensional loading constraints on a large scale |
May |
2022 |
The split heterogeneous vehicle routing problem with three-dimensional loading constraints on a large scale |
January |
2022 |
OPERATING ROOM SCHEDULING CONSIDERING PATIENT PRIORITIES AND OPERATING ROOM PREFERENCES: A CASE STUDY |
February |
2022 |